TEC Soundproof Wall
TEC Temporary Soundproof Wall Construction Procedures
* Note : Procedures with an X mark are not necessary for TEC temporary soundproof wall installation
1. Ground Clearance
2. Direct Impact Pile Driving for Foundation Piles
3. Auger Boring
4. Install Soundproof Wall Post
5. Cast Concrete
6. Cure Concrete
7. Assemble Horizontal Pipe
8. Assemble Soundproof Panel
9. Dismantle Soundproof Panel
10. Dismantle Horizontal Pipe
11. Dismantle Soundproof Wall Post
12. Excavate Around the Concrete
13. Dig Concrete
14. Break Concrete
15. Sort Waste and Dispose
16. Recover Materials